Skip to main content

Markets

What Is LCOE (Levelized Cost of Electricity)?

A measure of the average cost of electricity generation over a projects lifetime, including capital, fuel, and operations costs. Utility-scale solar LCOE is typically $25-40/MWh, making it among the cheapest electricity sources.

LCOE spreads every cost a plant will ever incur — construction, financing, fuel, maintenance — across every megawatt-hour it will ever produce, yielding a single per-MWh number that makes technologies comparable. On this measure, utility-scale solar and onshore wind have been the cheapest new-build generation in most of the US for years, which is why they dominate interconnection queues even absent climate policy.

LCOE's limitation is that it prices energy, not timing or reliability: a solar MWh at noon is not worth the same as a dispatchable MWh at 7 p.m. Analysts supplement it with metrics like levelized cost of storage and 'LCOE plus integration costs.' Used carefully, it remains the standard first-order answer to 'what's cheapest to build?'

Related terms

Part of the CleanPowerDaily Clean Energy Glossary 12 in-depth explainers and 50 defined terms. Definitions are free to cite with attribution.