What Is the Interconnection Queue?
The waiting line of proposed power projects seeking permission to connect to the grid. US queues hold far more proposed capacity than the country's entire existing fleet, with multi-year waits dominated by solar, storage, and wind.
Before a power plant can plug into the grid, the regional grid operator must study what upgrades its connection requires and who pays for them. Projects file requests and wait — often four or five years — while studies grind through a first-come, first-served backlog. Many projects enter the queue speculatively and later withdraw, which forces studies to be redone and stretches waits further.
Queue reform is one of the highest-leverage clean energy policy fights: FERC's Order 2023 pushed operators toward 'first-ready, first-served' cluster studies with stiffer deposits and readiness requirements. The queue is where the energy transition physically bottlenecks — most proposed US capacity is solar, storage, and wind, and every year of queue delay is a year of deferred clean generation.
Related terms
Part of the CleanPowerDaily Clean Energy Glossary — 12 in-depth explainers and 50 defined terms. Definitions are free to cite with attribution.